I spent some time optimising the CI runs for a recent project.
In this case there were two dimensions to optimise against:
- total CI minutes used (each month)
- duration of each CI run
Usually improvements to one dimension improve the other. But sometimes they’d conflict.
Unparallelise jobs
In this case, slightly increasing each run duration led to a big reduction in total CI minutes used.
The setup was a number of jobs running in parallel:
- shortJobA
- shortJobB
- shortJobC
- longJob
longJob
would always run, even if all of the shortJob
s failed. Changing the run ordering to:
- shortJobA --|
- shortJobB --|--> longJob
- shortJobC --|
Meant that longJob
would only run after all the shortJob
s passed. This made individual CI runs take slightly longer, but massively reduced the overall number of CI minutes used.
Other optimisations
Other optimisations fell into the following few categories:
- Remove unneccessary work
- Optimise slow work
- Cache results of expensive work
Remove, reduce or re-use. I guess that’s a general lesson for any code.